Diesel generator set run-in period need to pay attention to the point


Newly purchased generator sets have a running-in period, just like buying a car. The initial running-in period is very important for the subsequent use of the entire equipment, so the following is a detailed explanation of the matters that need to be paid attention to during the running-in period of diesel generator sets.

  1. During operation, especially when the load is suddenly reduced, care should be taken to prevent the diesel engine speed from suddenly increasing due to governor failure, which is also commonly known as “flying”. Once it exceeds the specified value, emergency measures should be taken quickly, and then the cause should be found out.
  2. The running-in plan of the diesel generator set should be considered according to the different uses and towing methods of the diesel engine. Note that the running time of idling or under-load conditions at the beginning of the running-in should not be too long.
  3. Whenever the cylinder liner, piston, piston ring, connecting rod bearing and crank are replaced, short-term running-in should be carried out appropriately according to the actual running-in conditions.
  4. After the diesel generator set is put into normal use, the indication values ​​of all instruments should be frequently observed and the dynamics of the whole machine operation should be observed. The cooling system inspection and the level inspection of the lubricating oil in each part need to be carried out regularly. If any non-compliance with the specified requirements or leakage is found, it should be replenished or the cause should be checked and eliminated.

The above is the points that need to be paid attention to during the running-in period of diesel generator sets compiled by Chongqing Baolai Power Generation Equipment Co., Ltd., I hope it will be helpful to everyone.